Most trails have exposed ground and debris
Good conditions on the New River Trail
Seen on the Quincy Trail
| Each post was buried around 4' deep with 160lbs of concrete added to the top and bottom |
| Posts are in! |
| Some holes that we dug were filling up with water too quick, so a pump was used |
| This job would have been very difficult without our John Deere 4044m and backhoe |
| A big thanks to Mark R for helping with the hinge welding |
![]() |
| Another thanks to the Hancock Public Works Dept. for lending us a portable arc welder |
| Done! |
![]() |
| Posts were buried around 4ft deep and 240lb of concrete was added in each hole |
![]() |
| A 4x4 post was added to support the weight of the gate |
![]() |
| Exposed culvert near Ruby Marsh. It won’t be long before water starts flowing over |
![]() |
| More water hazards are found behind the church |
![]() |
| The 6” of new snow was just enough to freshen the trails up one last time |
![]() |
| Get out and enjoy the trails while they last! |